Current · Commercial & Industrial

EV Charging for Workplaces and Apartments in Virginia

Need Professional Electrical Help?

Visit Our Booking Page

Employees, tenants and customers increasingly arrive in electric vehicles and ask where they can charge. Workplace, retail and apartment charging can attract and keep people, but it’s also a significant electrical load, and the most expensive part of a project is often the infrastructure, not the chargers.

Choose the Right Level of Charging

  • Level 2 (208 or 240 volt) suits workplaces, apartments and hotels, where cars sit for hours. It’s the most common choice.
  • DC fast charging suits places where drivers stop briefly, like retail and travel stops. It needs far more power, often new utility service, and costs much more.

Capacity Comes First

Several Level 2 chargers can add up to more than a building’s service has to spare. Before choosing a number of chargers, measure the building’s demand. See checking a building’s capacity.

Load management makes a big difference. The National Electrical Code allows an EV charging system to be sized to a managed maximum load, with chargers sharing a circuit’s capacity and slowing down when many are in use. That often lets you install more chargers without a service upgrade.

Plan for More Than Day One

Trenching and conduit are the expensive part of parking lot charging. Installing extra conduit and panel capacity for future chargers while the ground is open, called “make-ready,” costs far less than coming back later.

Practical Decisions

  • Networked or not: networked chargers can charge drivers, limit access, report usage and manage load.
  • Who pays: free for employees, fee-based for tenants or the public, or included in rent.
  • Accessibility: plan accessible charging spaces and routes.
  • Protection: bollards or wheel stops where chargers could be hit.
  • Lighting and signage at charging spaces.

Incentives

The federal Section 30C credit for charging equipment ended for property placed in service after June 30, 2026. Your utility (Appalachian Power, Dominion Energy or a cooperative) and charger manufacturers sometimes offer programs or rebates; check what’s available before you buy.

Permits

EV charging installations need electrical permits, and parking lot work may involve site permits. Locating underground utilities before trenching is required; see VA 811.

Adding charging for employees or tenants? Book a visit on our booking page and we’ll start with your building’s capacity.

Frequently Asked Questions

How many EV chargers can my building support?

It depends on measured demand and service size. Load management often allows more chargers than the service could carry at full power each.

Level 2 or DC fast charging for a workplace?

Level 2, in most cases. Employees park for hours, so slower charging meets their needs at a fraction of the cost.

Is the federal EV charger tax credit still available?

No, not for new installs. The Section 30C credit ended for property placed in service after June 30, 2026.

Can apartment complexes offer EV charging?

Yes. Shared, load-managed Level 2 chargers in common parking are a common approach, with access and billing handled by networked chargers.

Why Businesses and Property Managers Choose Progress and Heritage

We start with capacity, design for growth and install charging that works. Our licensed, insured, background-checked electricians serve Lynchburg, Roanoke, Danville, Martinsville and the surrounding counties. See our electrical installations and equipment, or our home EV charger guide.

Current

More practical guides from Progress and Heritage Electric. Browse every article →

Need Professional Electrical Help?

Visit Our Booking Page